Well, I received the engine spacers from Nick in Australia and all of the SP2 swingarm parts (pivot bolt, collars, washers, nuts etc.) from Ron Ayers so it was time to get the frame back on the engine and the swingarm in place. All the engine bolts are properly torqued and the new Ohlins shock in place. The triples are in loosely so up on the stands she goes. Here are some progress photos:
RC51 Build-up PT2
Leave a Reply
You must be logged in to post a comment.