RC51 Teardown PT2

Spent last night getting the swingarm removed and the engine out and this is the result….

Next I will remove the triple clamp and package it all to send off to the powdercoaters. Might be a while for the next update on this project – it’s a long winter and I have lots of time to complete the project before spring.

New items acquired:

  • front mount rad
  • SP2 swing arm
  • SP2 rear brake bracket
  • Corbin Seat
  • Armour Bodies race bodywork (I have some neat plans for this)

On the wish list – Turn One carbon air box and ram air inlet… we’ll see.

This entry was posted on Friday, November 28th, 2008 at 12:14 am and is filed under Motorcycles. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

You must be logged in to post a comment.